Swiss propose nuclear waste storage site near German border

Author of the article: BERLIN (AP) — Switzerland’s nuclear waste authority has proposed building the country’s permanent waste storage site close to the border with Germany, a decision viewed warily by its northern neighbor. The choice of the Noerdlich Laegern site ends a 14-year search for a preferred location, itself preceded by previous failed attempts.…
Swiss propose nuclear waste storage site near German border

Author of the article:

BERLIN (AP) — Switzerland’s nuclear waste authority has proposed building the country’s permanent waste storage site close to the border with Germany, a decision viewed warily by its northern neighbor.

The choice of the Noerdlich Laegern site ends a 14-year search for a preferred location, itself preceded by previous failed attempts. The head of waste authority Nagra, Matthias Braun, said on Monday that “the geology has spoken” and “Noerdlich Laegern is the best location with the biggest safety reserves.”

Financial Post Top Stories

Sign up to receive the daily top stories from the Financial Post, a division of Postmedia Network Inc.

By clicking on the sign up button you consent to receive the above newsletter from Postmedia Network Inc. You may unsubscribe any time by clicking on the unsubscribe link at the bottom of our emails. Postmedia Network Inc. | 365 Bloor Street East, Toronto, Ontario, M4W 3L4 | 416-383-2300

Two other locations had been under consideration for a site that is meant to be the permanent home for all Switzerland’s nuclear waste, which is currently kept at temporary storage facilities.

A thick level of opalinus clay, which is “very dense” and “binds radioactive material almost like a magnet,” is key to the choice of the site, Braun told reporters in the Swiss capital, Bern.

Nagra’s choice is only the start of a long process. It’s expected to be years before the government can sign off on the site, which would still need approval from parliament and possibly face a referendum. Construction could start in 2045, with the first waste being stored around 30 years from now.

The site is very close to the border with Germany, which is at best ambivalent toward nuclear power. The last three German nuclear power plants are due to shut at the end of this year, though the government wants to keep the option of reactivating two of them in case of an energy shortage in the following months.

A deputy German environment minister, Christian Kuehn, told news agency dpa after news of the choice first emerged over the weekend that the site would put “a great strain” on nearby areas. The mayor of the nearby German town of Hohentengen, Martin Benz, made clear that he wants information on possible accident scenarios and plans to deal with them.

Germany hasn’t yet chosen a permanent storage site for its own nuclear waste and isn’t expected to until 2031. A new search for a storage site, which authorities hope to start using in 2050, was launched two years ago.

Read More

Total
0
Shares
Leave a Reply

Your email address will not be published.

Related Posts
Adidas retracts opposition to Black Lives Matter three-stripe design
Read More

Adidas retracts opposition to Black Lives Matter three-stripe design

Author of the article: Reuters Blake Brittain and Helen Reid Published Mar 29, 2023  •  Last updated 15 hours ago  •  2 minute read Sportswear maker Adidas AG on Wednesday reversed course 48 hours after asking the U.S. Trademark Office to reject a Black Lives Matter application for a trademark featuring three parallel stripes. “Adidas will…
Manchin Says He Has ‘No Intentions’ of Ditching Democratic Party
Read More

Manchin Says He Has ‘No Intentions’ of Ditching Democratic Party

Democratic Senator Joe Manchin said he has “no intentions” of switching political parties, but didn’t rule out the possibility in the future. Author of the article: Bloomberg News Jarrell Dillard Published Dec 18, 2022  •  1 minute read Join the conversation Senator Joe Manchin, a Democrat from West Virginia, speaks on the phone during the…
Ukraine c.bank keeps key rate unchanged at 25% as war rages on
Read More

Ukraine c.bank keeps key rate unchanged at 25% as war rages on

Author of the article: KYIV — Ukraine’s central bank kept its main interest rate unchanged at 25% on Thursday, saying that inflationary pressure remained high and that an extended full-scale war with Russia was the key economic risk. In a statement, the central bank said inflation had been slightly slower than its earlier forecast and…
Chevron, Talos sign MOU to develop Texas carbon capture plant
Read More

Chevron, Talos sign MOU to develop Texas carbon capture plant

This advertisement has not loaded yet, but your article continues below. Author of the article: Article content Oil and gas producers Chevron Corp and Talos Energy Inc have signed a memorandum of understanding for a joint venture to develop the Bayou Bend CCS offshore carbon capture and sequestration hub in Texas, the companies said on…