Criticality for Both High Temperature Pebble Bed Reactors

Both nuclear reactors of the High-Temperature Gas Cooled Reactor-Pebble-bed Module (HTR-PM) at the Shidaowan plant in China’s Shandong province have reached criticality for the first time. The HTR-PM has two 250 MW thermal reactors that drive a single 210 MWe turbine. Commercial 600 MWe pebble bed reactors (6×250 MWt, total 655 MWe) will follow. the…
Criticality for Both High Temperature Pebble Bed Reactors


Both nuclear reactors of the High-Temperature Gas Cooled Reactor-Pebble-bed Module (HTR-PM) at the Shidaowan plant in China’s Shandong province have reached criticality for the first time. The HTR-PM has two 250 MW thermal reactors that drive a single 210 MWe turbine.

Commercial 600 MWe pebble bed reactors (6×250 MWt, total 655 MWe) will follow.

the HTR-PM600 plan was in a 2017 presentation.

The HTR-PM600 commercial system will have less than 40% of the costs for the HTR-PM. This would have costs of about $2500 per KWe. The 600 MWe unit would cost $1.5 billion if that cost target could be reached.

SOURCES- World Nuclear News, IAEA


Written by Brian Wang, Nextbigfuture.com

Subscribe on Google News

Read More

Total
0
Shares
Leave a Reply

Your email address will not be published.

Related Posts
Reports of Ground Invasion in Gaza and West Bank
Read More

Reports of Ground Invasion in Gaza and West Bank

It looks like the Israeli ground invasion has begun. Over 100 IDF Armored Vehicles, including a number of Caterpillar D9 Armored-Bulldozers, have reportedly entered the City of Jenin in the West Bank within the last hour. There are reports that the ground war has started in Gaza as well. HAPPENING NOW:It looks like the Israeli…