Codelco Lowers Copper Output Guidance as Chile Mining Woes Worsen

Codelco, the world’s biggest copper supplier, lowered its annual production guidance and raised cost estimates after another disappointing quarter at its mines and projects in Chile. Author of the article: Bloomberg News James Attwood Published Jul 28, 2023  •  2 minute read The Codelco Chuquicamata open pit copper mine stands near Calama, Chile, on Thursday,…
Codelco Lowers Copper Output Guidance as Chile Mining Woes Worsen

Codelco, the world’s biggest copper supplier, lowered its annual production guidance and raised cost estimates after another disappointing quarter at its mines and projects in Chile.

Author of the article:

Bloomberg News

James Attwood

Published Jul 28, 2023  •  2 minute read

The Codelco Chuquicamata open pit copper mine stands near Calama, Chile, on Thursday, Aug. 2, 2018. Protests at the Chuquicamata copper mine in late July were the first labor disruptions in Chile this year, and happened amid calls for a strike from the union at the world’s largest mine, BHP Billiton Ltd.’s Escondida. Photo by Cristobal Olivares /Bloomberg

(Bloomberg) — Codelco, the world’s biggest copper supplier, lowered its annual production guidance and raised cost estimates after another disappointing quarter at its mines and projects in Chile.

Advertisement 2

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles by Kevin Carmichael, Victoria Wells, Jake Edmiston, Gabriel Friedman and others.
  • Daily content from Financial Times, the world’s leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

Subscribe now to read the latest news in your city and across Canada.

  • Exclusive articles by Kevin Carmichael, Victoria Wells, Jake Edmiston, Gabriel Friedman and others.
  • Daily content from Financial Times, the world’s leading global business publication.
  • Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
  • National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
  • Daily puzzles, including the New York Times Crossword.

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

The state-owned behemoth’s output is running at the lowest in a quarter century, prices are down and costs are up — all at a time when the world needs more copper for batteries and electric grids in the shift away from fossil fuels.

Article content

Codelco’s woes are part of an industrywide story as ore grades decline and new deposits get harder and costlier to develop amid supply chain disruptions, inflation and construction bottlenecks. The firm is investing about $3.5 billion a year in a bid to reverse the output slump, juggling four major upgrade projects that have been hit by delays and cost blowouts.

Second-quarter production dropped 17% from a year earlier, based on calculations from first-half results reported by the Santiago-based firm on Friday. The annual projection was cut to between 1.31 million and 1.35 million metric tons from a previous call of 1.35 million to 1.42 million. 

Advertisement 3

Read More: The Green Energy Transition Has a Chile Copper Problem

The output decline has accelerated due to project delays and mishaps at mines, hindering Codelco’s contributions to a government that needs more money to fight festering inequalities. Damage from a seismic event Monday will curb production at the giant El Teniente underground mine. 

Besides the production guidance cut, Codelco lifted its cost estimate for the year to $2.20-$2.35 a pound from $1.90-$2.02. 

Chief Executive Officer Andre Sougarret resigned last month after failing to reconcile the demands of the job with those of his personal life. His replacement may by announced next month.  

Chairman Maximo Pacheco, the former government minister and paper company executive, has become the public face of Codelco, attempting to get projects back on track while also taking on a prominent role in Chile’s new state-led approach to lithium.

Pacheco expects Codelco’s copper production to begin to recover next year as new projects ramp up. The investment burden and project challenges that Codelco is enduring now will set up the company for another 50 years of production, he said earlier this month. 

(Adds increase in annual cost guidance in sixth paragraph)

Article content

Read More

Total
0
Shares
Leave a Reply

Your email address will not be published.

Related Posts
Vector Institute partners with World Economic Forum on responsible artificial intelligence and research insights
Read More

Vector Institute partners with World Economic Forum on responsible artificial intelligence and research insights

Author of the article: Published Sep 14, 2023  •  3 minute read Vector’s President and CEO Tony Gaffney joins AI Governance Alliance and Vector Faculty Member Jeff Clune joins Safe Systems and Technologies counsel TORONTO, Sept. 14, 2023 (GLOBE NEWSWIRE) — Today, the Vector Institute announced a new partnership with the World Economic Forum. Through…
Japan lowers gasoline subsidy to 20.3 yen/liter
Read More

Japan lowers gasoline subsidy to 20.3 yen/liter

Author of the article: TOKYO — Japan cut its gasoline subsidy for oil distributors to 20.3 yen ($0.16) a liter for the seven days from April 14, down from 20.7 yen a week earlier, the industry ministry said on Wednesday. Japan implemented a temporary subsidy program in January to mitigate high fuel prices after tight…
Euro zone bond yields soar as ECB presses on with stimulus exit
Read More

Euro zone bond yields soar as ECB presses on with stimulus exit

Author of the article: Reuters Yoruk Bahceli and Dhara Ranasinghe Euro zone bond yields soared on Thursday after the European Central Bank said it plans to end bond buying in the third quarter, as surging inflation outweighs the risks to economic growth from Russia’s invasion of Ukraine. Bond yields in Italy, a key beneficiary of…
Carrefour Brasil’s shareholders approve Grupo BIG acquisition
Read More

Carrefour Brasil’s shareholders approve Grupo BIG acquisition

This advertisement has not loaded yet, but your article continues below. Author of the article: Article content SAO PAULO — Shareholders of Carrefour Brasil approved on Thursday the acquisition of Grupo BIG Brasil SA, according to a securities filing. The local unit of the French retail giant announced on March 2021 the acquisition of Grupo…